Execution of 44,450 m2 of climbed piers with a maximum height of 77 meters and a 10.50 x 4.50 m section.
All this work was executed with metallic molds specially designed for it.
Client
CountryPortugal
Dates03/01/2011 – 17/08/2013
Project TypeLand
Execution of 44,450 m2 of climbed piers with a maximum height of 77 meters and a 10.50 x 4.50 m section.
All this work was executed with metallic molds specially designed for it.